top of page

Featured

Stonewall Harley Davidson

This 23,210 SF new dealership in Ruckersville features a comprehensive construction scope, including the foundation, walls, slab-on-grade (SOG), slab-on-metal-deck (SOMD), and a topping slab. The exposed concrete slab was designed to be part of the final flooring, utilizing a laser screed to achieve precise Ff (floor flatness) and Fl (floor levelness) for optimal performance and finish quality.

Paulist Fathers House

The Paulist Fathers House project covers 11,073 SF with a slab-on-grade design, utilizing 1,438 cubic yards of concrete. The scope includes the construction of footings, columns, walls, and a premium slab-on-grade to ensure a strong, durable foundation for the building.